Milestone N. Milestone name WP Lead beneficiarySorted descending Delivery date Comments
MS5 Archive user requirements document WP2 UL 01/10/2014  
MS2 Agreed testbed environment with ESAC-SAT & CU9 WP3 UEDIN 01/02/2014 The testbed for Archive development has been agreed with SAT. And is based on the Gaia Archive Core System (GACS) described at the CU9 SDP..
MS9 User prototype archive review WP2, WP3 UEDIN 01/10/2015 Completed (with delay, as described in the previous report) by the beta-testing group of the Gaia archive.
MS13 Stress test WP3 UEDIN 01/09/2016 A test suite has been designed to stress test the system and details of this along with results for the GENIUS prototype querying system are in the process of being documented (http://gaia.esac.esa.int/dpacsvn/DPAC/CU9/docs/WP930_Architecture/nonECSS/TechNotes/GAIA-C9-TN-IFA-STV-001/GAIA-C9-TN-IFA-STV-001.pdf) Formal attainment of milestone MS13 has been delayed to the end of the year (31/12/2016) owing to delays in prototype deployment of the full distributed querying system. These delays were caused in part by refactoring of the various subsystems into Docker-deployable containers along with higher priority work in collaboration with Gaia DPAC CU9 and ESAC-ESDC concerning Gaia DR1 data model issues and VO integration work (content descriptors and ADQL language etc.)
MS1 Kick-off meeting (plenary) WP1 UB 01/11/2013 Meeting took place 4-5 Dec 2013
MS3 Hiring of main developers WP1, WP2, WP3, WP5, WP4, WP6, WP7 UB 01/06/2014  
MS6 Requirements document for each subsystem WP2, WP3, WP4, WP5 UB 01/10/2014 WP3 SRS
MS8 Mid-term review WP1, WP2, WP3, WP4, WP5, WP6, WP7 UB 01/06/2015 Plenary meeting to take place in Sept in Barcelona. Mid term review in Nov. 2015 in Leiden (agreed with PO during the 1st year review)
MS10 Exploitation tools review WP2, WP4 UB 01/10/2015 Specific session during CU9 plenary meeting Sept. 2015: https://gaia.am.ub.es/Twiki/bin/view/GENIUS/PlenaryMeeting2015
MS12 Prototype archive tools open to community WP1, WP2, WP3, WP4, WP5, WP6, WP7 UB 01/10/2015 User testing will allow to give the necessary feedback on the archive tools which have been developed. Most Gaia data will not be available at the date of the milestone, but the testing will nevertheless be possible by providing access to simulated data. In order to get a feedback as large as possible on the archive tools, the access will be given to a large panel of users within and outside the Gaia community. They will e.g. be selected among the users having made requirements proposals (cf. GAIA-C9-TN-LEI-AB-026-1).
MS15 Completion meeting & final external review WP1 UB 01/03/2017  
MS16 GENIUS products availability WP1, WP2, WP3, WP4, WP5, WP6, WP7 UB 01/04/2017 GENIUS products availability
MS4 GENIUS portal available at CESCA for internal use WP6, WP7 CSUC 01/04/2014 Two GENIUS portal developed at CESCA: one dedicated to the project and one for more general dissemination.
MS7 Public version of GENIUS portal WP6, WP7 CSUC 01/10/2014 Public version of GENIUS portal
MS17 Handover of GENIUS portal to Gaia community WP7 CSUC 01/04/2017 Handover of GENIUS portal to Gaia community
MS11 Validation tools review WP2, WP5 CNRS 01/10/2015 Specific session during CU9 plenary meeting Sept. 2015: https://gaia.am.ub.es/Twiki/bin/view/GENIUS/PlenaryMeeting2015
MS14 Load of actual Gaia data WP3, WP5 CNRS 01/01/2017 Load of actual Gaia data

European_Flag.png

The research leading to these results has received funding from the European Community's Seventh Framework Programme (FP7-SPACE-2013-1) under grant agreement n°606740.

Topic revision: r15 - 2016-12-02 - LolaBalaguer
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback