Difference: ReGLanz (1 vs. 3)

Revision 32013-12-10 - FrancescaFigueras

Line: 1 to 1
 
META TOPICPARENT name="DivulgacionCientifica"

Detalles lanzamiento

Changed:
<
<
ESA ha publicado ya la secuencia de lanzamiento de Gaia. Podéis encontrarla aqui. A continuación se indican los pasos mas críticos:
>
>
ESA ha publicado ya la secuencia de lanzamiento de Gaia. Podéis encontrarla aqui. A continuación reproducimos la secuencia indicando los pasos mas críticos:
 
  • L = lift off (19/12 is 9:12 UTC = 6:12 Kourou, 10:12 Paris)
  • L + 2 min: 1st stage-2nd stage separation

Revision 22013-12-09 - FrancescaFigueras

Line: 1 to 1
 
META TOPICPARENT name="DivulgacionCientifica"

Detalles lanzamiento

Added:
>
>
ESA ha publicado ya la secuencia de lanzamiento de Gaia. Podéis encontrarla aqui. A continuación se indican los pasos mas críticos:
 
  • L = lift off (19/12 is 9:12 UTC = 6:12 Kourou, 10:12 Paris)
  • L + 2 min: 1st stage-2nd stage separation
  • L + 3 min: Fairing separation
Line: 14 to 16
 
  • L + 9 min: Nose module separation (nose module= S/C plus Fregat)
  • L + 10 min: 1st Fregat burn
  • L + 21 min: 2nd Fregat burn
Changed:
<
<
  • L+ 43 min: spacecraft separation, switch on transponder, switch on gyros, release the payload bipods (connection between the PLM and the SVM) ---> critical
>
>
  • L+ 43 min: spacecraft separation, switch on transponder, switch on gyros, release the payload bipods (connection between the PLM and the SVM) ---> critical
 
  • L+ 43 min: CPS priming (configure and pressurise the propulsion system) ---> critical
  • L + 1 h: configure the thermal control, acquire the sun and put the spacecraft in the right attitude
  • L +1 h 18 min: start deployment of the sun shield ---> critical

Revision 12013-12-05 - FrancescaFigueras

Line: 1 to 1
Added:
>
>
META TOPICPARENT name="DivulgacionCientifica"
<--  
-->

Detalles lanzamiento

  • L = lift off (19/12 is 9:12 UTC = 6:12 Kourou, 10:12 Paris)
  • L + 2 min: 1st stage-2nd stage separation
  • L + 3 min: Fairing separation
  • L + 5 min: 2nd stage - 3rd stage separation
  • L + 9 min: Nose module separation (nose module= S/C plus Fregat)
  • L + 10 min: 1st Fregat burn
  • L + 21 min: 2nd Fregat burn
  • L+ 43 min: spacecraft separation, switch on transponder, switch on gyros, release the payload bipods (connection between the PLM and the SVM) ---> critical
  • L+ 43 min: CPS priming (configure and pressurise the propulsion system) ---> critical
  • L + 1 h: configure the thermal control, acquire the sun and put the spacecraft in the right attitude
  • L +1 h 18 min: start deployment of the sun shield ---> critical
  • L + 1 h 28 min: end deployment of the sun shield ---> critical
  • In case at 1 h 28 min the deployment is not achieved the following happens:
    • L + 1 h + 28 min: start 2nd deployment sequence with redundant system
    • L + 1 h + 38 min: end 2nd deployment sequence with redundant system
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback