MS10 Exploitation tools review WP2, WP4 UB 01/10/2015 Specific session during CU9 plenary meeting Sept. 2015: https://gaia.am.ub.es/Twiki/bin/view/GENIUS/PlenaryMeeting2015
MS11 Validation tools review WP2, WP5 CNRS 01/10/2015 Specific session during CU9 plenary meeting Sept. 2015: https://gaia.am.ub.es/Twiki/bin/view/GENIUS/PlenaryMeeting2015
MS12 Prototype archive tools open to community WP1, WP2, WP3, WP4, WP5, WP6, WP7 UB 01/10/2015 User testing will allow to give the necessary feedback on the archive tools which have been developed. Most Gaia data will not be available at the date of the milestone, but the testing will nevertheless be possible by providing access to simulated data. In order to get a feedback as large as possible on the archive tools, the access will be given to a large panel of users within and outside the Gaia community. They will e.g. be selected among the users having made requirements proposals (cf. GAIA-C9-TN-LEI-AB-026-1).
Changed:
<
<
MS13 Stress test WP3 UEDIN 01/09/2016  
>
>
MS13 Stress test WP3 UEDIN 01/09/2016 A test suite has been designed to stress test the system and details of this along with results for the GENIUS prototype querying system are in the process of being documented (http://gaia.esac.esa.int/dpacsvn/DPAC/CU9/docs/WP930_Architecture/nonECSS/TechNotes/GAIA-C9-TN-IFA-STV-001/GAIA-C9-TN-IFA-STV-001.pdf) Formal attainment of milestone MS13 has been delayed to the end of the year (31/12/2016) owing to delays in prototype deployment of the full distributed querying system. These delays were caused in part by refactoring of the various subsystems into Docker-deployable containers along with higher priority work in collaboration with Gaia DPAC CU9 and ESAC-ESDC concerning Gaia DR1 data model issues and VO integration work (content descriptors and ADQL language etc.)
 
MS14 Load of actual Gaia data WP3, WP5 CNRS 01/01/2017 Load of actual Gaia data
MS15 Completion meeting & final external review WP1 UB 01/03/2017  
MS16 GENIUS products availability WP1, WP2, WP3, WP4, WP5, WP6, WP7 UB 01/04/2017 GENIUS products availability

Revision 142016-05-04 - LolaBalaguer

Line: 1 to 1
 
META TOPICPARENT name="WebLeftBar"

GENIUS Milestones

Line: 11 to 11
 
MS6 Requirements document for each subsystem WP2, WP3, WP4, WP5 UB 01/10/2014 WP3 SRS
MS7 Public version of GENIUS portal WP6, WP7 CSUC 01/10/2014 Public version of GENIUS portal
MS8 Mid-term review WP1, WP2, WP3, WP4, WP5, WP6, WP7 UB 01/06/2015 Plenary meeting to take place in Sept in Barcelona. Mid term review in Nov. 2015 in Leiden (agreed with PO during the 1st year review)
Changed:
<
<
MS9 User prototype archive review WP2, WP3 UEDIN 01/10/2015 being delayed by 3 to 6 months in
order to synchronise with the DPAC CU9 Gaia DR1 rehearsal and beta–testing of GACS.
>
>
MS9 User prototype archive review WP2, WP3 UEDIN 01/10/2015 Completed (with delay, as described in the previous report) by the beta-testing group of the Gaia archive.
 
MS10 Exploitation tools review WP2, WP4 UB 01/10/2015 Specific session during CU9 plenary meeting Sept. 2015: https://gaia.am.ub.es/Twiki/bin/view/GENIUS/PlenaryMeeting2015
MS11 Validation tools review WP2, WP5 CNRS 01/10/2015 Specific session during CU9 plenary meeting Sept. 2015: https://gaia.am.ub.es/Twiki/bin/view/GENIUS/PlenaryMeeting2015
Changed:
<
<
MS12 Prototype archive tools open to community WP1, WP2, WP3, WP4, WP5, WP6, WP7 UB 01/10/2015 User testing will allow to give the necessary feedback on the archive tools which have been developed. Most Gaia data will not be available at the date of the milestone, but the testing will nevertheless be possible by providing access to simulated data. In order to get a feedback as large as possible on the archive tools, the access will be given to a large panel of users within and outside the Gaia community. They will e.g. be selected among the users having made requirements proposals (cf. GAIA-C9-TN-LEI-AB-026-1).
>
>
MS12 Prototype archive tools open to community WP1, WP2, WP3, WP4, WP5, WP6, WP7 UB 01/10/2015 User testing will allow to give the necessary feedback on the archive tools which have been developed. Most Gaia data will not be available at the date of the milestone, but the testing will nevertheless be possible by providing access to simulated data. In order to get a feedback as large as possible on the archive tools, the access will be given to a large panel of users within and outside the Gaia community. They will e.g. be selected among the users having made requirements proposals (cf. GAIA-C9-TN-LEI-AB-026-1).
 
MS13 Stress test WP3 UEDIN 01/09/2016  
MS14 Load of actual Gaia data WP3, WP5 CNRS 01/01/2017 Load of actual Gaia data
MS15 Completion meeting & final external review WP1 UB 01/03/2017  

Revision 132016-04-12 - LolaBalaguer

Line: 1 to 1
 
META TOPICPARENT name="WebLeftBar"

GENIUS Milestones

Line: 10 to 10
 
MS5 Archive user requirements document WP2 UL 01/10/2014  
MS6 Requirements document for each subsystem WP2, WP3, WP4, WP5 UB 01/10/2014 WP3 SRS
MS7 Public version of GENIUS portal WP6, WP7 CSUC 01/10/2014 Public version of GENIUS portal
Changed:
<
<
MS8 Mid-term review WP1, WP2, WP3, WP4, WP5, WP6, WP7 UB 01/06/2015 Plenary meeting to take place in Sept in Barcelona. Mid term review in Nov. 2015 in Leiden (agreed with PO during the 1st year review)
>
>
MS8 Mid-term review WP1, WP2, WP3, WP4, WP5, WP6, WP7 UB 01/06/2015 Plenary meeting to take place in Sept in Barcelona. Mid term review in Nov. 2015 in Leiden (agreed with PO during the 1st year review)
 
MS9 User prototype archive review WP2, WP3 UEDIN 01/10/2015 being delayed by 3 to 6 months in
order to synchronise with the DPAC CU9 Gaia DR1 rehearsal and beta–testing of GACS.
MS10 Exploitation tools review WP2, WP4 UB 01/10/2015 Specific session during CU9 plenary meeting Sept. 2015: https://gaia.am.ub.es/Twiki/bin/view/GENIUS/PlenaryMeeting2015
MS11 Validation tools review WP2, WP5 CNRS 01/10/2015 Specific session during CU9 plenary meeting Sept. 2015: https://gaia.am.ub.es/Twiki/bin/view/GENIUS/PlenaryMeeting2015

Revision 122015-10-16 - XaviLuri

Line: 1 to 1
 
META TOPICPARENT name="WebLeftBar"

GENIUS Milestones

Line: 12 to 12
 
MS7 Public version of GENIUS portal WP6, WP7 CSUC 01/10/2014 Public version of GENIUS portal
MS8 Mid-term review WP1, WP2, WP3, WP4, WP5, WP6, WP7 UB 01/06/2015 Plenary meeting to take place in Sept in Barcelona. Mid term review in Nov. 2015 in Leiden (agreed with PO during the 1st year review)
MS9 User prototype archive review WP2, WP3 UEDIN 01/10/2015 being delayed by 3 to 6 months in
order to synchronise with the DPAC CU9 Gaia DR1 rehearsal and beta–testing of GACS.
Changed:
<
<
MS10 Exploitation tools review WP2, WP4 UB 01/10/2015  
MS11 Validation tools review WP2, WP5 CNRS 01/10/2015 Validation tools review
>
>
MS10 Exploitation tools review WP2, WP4 UB 01/10/2015 Specific session during CU9 plenary meeting Sept. 2015: https://gaia.am.ub.es/Twiki/bin/view/GENIUS/PlenaryMeeting2015
MS11 Validation tools review WP2, WP5 CNRS 01/10/2015 Specific session during CU9 plenary meeting Sept. 2015: https://gaia.am.ub.es/Twiki/bin/view/GENIUS/PlenaryMeeting2015
 
MS12 Prototype archive tools open to community WP1, WP2, WP3, WP4, WP5, WP6, WP7 UB 01/10/2015 User testing will allow to give the necessary feedback on the archive tools which have been developed. Most Gaia data will not be available at the date of the milestone, but the testing will nevertheless be possible by providing access to simulated data. In order to get a feedback as large as possible on the archive tools, the access will be given to a large panel of users within and outside the Gaia community. They will e.g. be selected among the users having made requirements proposals (cf. GAIA-C9-TN-LEI-AB-026-1).
MS13 Stress test WP3 UEDIN 01/09/2016  
MS14 Load of actual Gaia data WP3, WP5 CNRS 01/01/2017 Load of actual Gaia data

Revision 112015-10-16 - XaviLuri

Line: 1 to 1
 
META TOPICPARENT name="WebLeftBar"

GENIUS Milestones

Line: 10 to 10
 
MS5 Archive user requirements document WP2 UL 01/10/2014  
MS6 Requirements document for each subsystem WP2, WP3, WP4, WP5 UB 01/10/2014 WP3 SRS
MS7 Public version of GENIUS portal WP6, WP7 CSUC 01/10/2014 Public version of GENIUS portal
Changed:
<
<
MS8 Mid-term review WP1, WP2, WP3, WP4, WP5, WP6, WP7 UB 01/06/2015  
MS9 User prototype archive review WP2, WP3 UEDIN 01/10/2015  
>
>
MS8 Mid-term review WP1, WP2, WP3, WP4, WP5, WP6, WP7 UB 01/06/2015 Plenary meeting to take place in Sept in Barcelona. Mid term review in Nov. 2015 in Leiden (agreed with PO during the 1st year review)
MS9 User prototype archive review WP2, WP3 UEDIN 01/10/2015 being delayed by 3 to 6 months in
order to synchronise with the DPAC CU9 Gaia DR1 rehearsal and beta–testing of GACS.
 
MS10 Exploitation tools review WP2, WP4 UB 01/10/2015  
MS11 Validation tools review WP2, WP5 CNRS 01/10/2015 Validation tools review
MS12 Prototype archive tools open to community WP1, WP2, WP3, WP4, WP5, WP6, WP7 UB 01/10/2015 User testing will allow to give the necessary feedback on the archive tools which have been developed. Most Gaia data will not be available at the date of the milestone, but the testing will nevertheless be possible by providing access to simulated data. In order to get a feedback as large as possible on the archive tools, the access will be given to a large panel of users within and outside the Gaia community. They will e.g. be selected among the users having made requirements proposals (cf. GAIA-C9-TN-LEI-AB-026-1).

Revision 102015-08-13 - LolaBalaguer

Line: 1 to 1
 
META TOPICPARENT name="WebLeftBar"

GENIUS Milestones

Line: 10 to 10
 
MS5 Archive user requirements document WP2 UL 01/10/2014  
MS6 Requirements document for each subsystem WP2, WP3, WP4, WP5 UB 01/10/2014 WP3 SRS
MS7 Public version of GENIUS portal WP6, WP7 CSUC 01/10/2014 Public version of GENIUS portal
Changed:
<
<
MS8 Mid-term review WP1, WP2, WP3, WP4, WP5, WP6, WP7 UB 01/06/2015  
MS9 User prototype archive review WP2, WP3 UEDIN 01/10/2015  
MS10 Exploitation tools review WP2, WP4 UB 01/10/2015  
MS11 Validation tools review WP2, WP5 CNRS 01/10/2015 Validation tools review
MS12 Prototype archive tools open to community WP1, WP2, WP3, WP4, WP5, WP6, WP7 UB 01/10/2015 User testing will allow to give the necessary feedback on the archive tools which have been developed. Most Gaia data will not be available at the date of the milestone, but the testing will nevertheless be possible by providing access to simulated data. In order to get a feedback as large as possible on the archive tools, the access will be given to a large panel of users within and outside the Gaia community. They will e.g. be selected among the users having made requirements proposals (cf. GAIA-C9-TN-LEI-AB-026-1).
>
>
MS8 Mid-term review WP1, WP2, WP3, WP4, WP5, WP6, WP7 UB 01/06/2015  
MS9 User prototype archive review WP2, WP3 UEDIN 01/10/2015  
MS10 Exploitation tools review WP2, WP4 UB 01/10/2015  
MS11 Validation tools review WP2, WP5 CNRS 01/10/2015 Validation tools review
MS12 Prototype archive tools open to community WP1, WP2, WP3, WP4, WP5, WP6, WP7 UB 01/10/2015 User testing will allow to give the necessary feedback on the archive tools which have been developed. Most Gaia data will not be available at the date of the milestone, but the testing will nevertheless be possible by providing access to simulated data. In order to get a feedback as large as possible on the archive tools, the access will be given to a large panel of users within and outside the Gaia community. They will e.g. be selected among the users having made requirements proposals (cf. GAIA-C9-TN-LEI-AB-026-1).
 
MS13 Stress test WP3 UEDIN 01/09/2016  
MS14 Load of actual Gaia data WP3, WP5 CNRS 01/01/2017 Load of actual Gaia data
MS15 Completion meeting & final external review WP1 UB 01/03/2017  

Revision 92014-11-21 - LolaBalaguer

Line: 1 to 1
 
META TOPICPARENT name="WebLeftBar"

GENIUS Milestones

Line: 22 to 22
 
MS17 Handover of GENIUS portal to Gaia community WP7 CSUC 01/04/2017 Handover of GENIUS portal to Gaia community

Added:
>
>
European_Flag.png
 The research leading to these results has received funding from the European Community's Seventh Framework Programme (FP7-SPACE-2013-1) under grant agreement n°606740.

META FILEATTACHMENT attachment="GAIA-C9-SP-IFA-NCH-031.pdf" attr="h" comment="WP3 System Requirements Specification" date="1415703196" name="GAIA-C9-SP-IFA-NCH-031.pdf" path="GAIA-C9-SP-IFA-NCH-031.pdf" size="161635" user="NigelHambly" version="1"

Revision 82014-11-21 - LolaBalaguer

Line: 1 to 1
 
META TOPICPARENT name="WebLeftBar"

GENIUS Milestones

Line: 21 to 21
 
MS16 GENIUS products availability WP1, WP2, WP3, WP4, WP5, WP6, WP7 UB 01/04/2017 GENIUS products availability
MS17 Handover of GENIUS portal to Gaia community WP7 CSUC 01/04/2017 Handover of GENIUS portal to Gaia community

Added:
>
>

The research leading to these results has received funding from the European Community's Seventh Framework Programme (FP7-SPACE-2013-1) under grant agreement n°606740.
 
META FILEATTACHMENT attachment="GAIA-C9-SP-IFA-NCH-031.pdf" attr="h" comment="WP3 System Requirements Specification" date="1415703196" name="GAIA-C9-SP-IFA-NCH-031.pdf" path="GAIA-C9-SP-IFA-NCH-031.pdf" size="161635" user="NigelHambly" version="1"

Revision 72014-11-20 - LolaBalaguer

Line: 1 to 1
 
META TOPICPARENT name="WebLeftBar"

GENIUS Milestones

Line: 6 to 6
 
MS1 Kick-off meeting (plenary) WP1 UB 01/11/2013 Meeting took place 4-5 Dec 2013
MS2 Agreed testbed environment with ESAC-SAT & CU9 WP3 UEDIN 01/02/2014 The testbed for Archive development has been agreed with SAT. And is based on the Gaia Archive Core System (GACS) described at the CU9 SDP..
MS3 Hiring of main developers WP1, WP2, WP3, WP5, WP4, WP6, WP7 UB 01/06/2014  
Changed:
<
<
MS4 GENIUS portal available at CESCA for internal use WP6, WP7 CESCA 01/04/2014 Two GENIUS portal developed at CESCA: one dedicated to the project and one for more general dissemination.
MS5 Archive user requirements document WP2 UL 01/10/2014  
MS6 Requirements document for each subsystem WP2, WP3, WP4, WP5 UB 01/10/2014 WP3 SRS
MS7 Public version of GENIUS portal WP6, WP7 CESCA 01/10/2014 Public version of GENIUS portal
>
>
MS4 GENIUS portal available at CESCA for internal use WP6, WP7 CSUC 01/04/2014 Two GENIUS portal developed at CESCA: one dedicated to the project and one for more general dissemination.
MS5 Archive user requirements document WP2 UL 01/10/2014  
MS6 Requirements document for each subsystem WP2, WP3, WP4, WP5 UB 01/10/2014 WP3 SRS
MS7 Public version of GENIUS portal WP6, WP7 CSUC 01/10/2014 Public version of GENIUS portal
 
MS8 Mid-term review WP1, WP2, WP3, WP4, WP5, WP6, WP7 UB 01/06/2015  
MS9 User prototype archive review WP2, WP3 UEDIN 01/10/2015  
MS10 Exploitation tools review WP2, WP4 UB 01/10/2015  
Line: 19 to 19
 
MS14 Load of actual Gaia data WP3, WP5 CNRS 01/01/2017 Load of actual Gaia data
MS15 Completion meeting & final external review WP1 UB 01/03/2017  
MS16 GENIUS products availability WP1, WP2, WP3, WP4, WP5, WP6, WP7 UB 01/04/2017 GENIUS products availability
Changed:
<
<
MS17 Handover of GENIUS portal to Gaia community WP7 CESCA 01/04/2017 Handover of GENIUS portal to Gaia community
>
>
MS17 Handover of GENIUS portal to Gaia community WP7 CSUC 01/04/2017 Handover of GENIUS portal to Gaia community

 
META FILEATTACHMENT attachment="GAIA-C9-SP-IFA-NCH-031.pdf" attr="h" comment="WP3 System Requirements Specification" date="1415703196" name="GAIA-C9-SP-IFA-NCH-031.pdf" path="GAIA-C9-SP-IFA-NCH-031.pdf" size="161635" user="NigelHambly" version="1"

Revision 62014-11-20 - LolaBalaguer

Line: 1 to 1
 
META TOPICPARENT name="WebLeftBar"

GENIUS Milestones

Milestone N.
<-- -->
Sorted ascending
Milestone name WP Lead beneficiary Delivery date Comments
MS1 Kick-off meeting (plenary) WP1 UB 01/11/2013 Meeting took place 4-5 Dec 2013
MS2 Agreed testbed environment with ESAC-SAT & CU9 WP3 UEDIN 01/02/2014 The testbed for Archive development has been agreed with SAT. And is based on the Gaia Archive Core System (GACS) described at the CU9 SDP..
Changed:
<
<
MS3 Hiring of main developers WP1, WP2, WP3, WP4, WP5, WP6, WP7 UB 01/02/2014  
>
>
MS3 Hiring of main developers WP1, WP2, WP3, WP5, WP4, WP6, WP7 UB 01/06/2014  
 
MS4 GENIUS portal available at CESCA for internal use WP6, WP7 CESCA 01/04/2014 Two GENIUS portal developed at CESCA: one dedicated to the project and one for more general dissemination.
MS5 Archive user requirements document WP2 UL 01/10/2014  
MS6 Requirements document for each subsystem WP2, WP3, WP4, WP5 UB 01/10/2014 WP3 SRS

Revision 52014-11-11 - NigelHambly

Line: 1 to 1
 
META TOPICPARENT name="WebLeftBar"

GENIUS Milestones

Line: 8 to 8
 
MS3 Hiring of main developers WP1, WP2, WP3, WP4, WP5, WP6, WP7 UB 01/02/2014  
MS4 GENIUS portal available at CESCA for internal use WP6, WP7 CESCA 01/04/2014 Two GENIUS portal developed at CESCA: one dedicated to the project and one for more general dissemination.
MS5 Archive user requirements document WP2 UL 01/10/2014  
Changed:
<
<
MS6 Requirements document for each subsystem WP2, WP3, WP4, WP5 UB 01/10/2014 WP3 SRS
>
>
MS6 Requirements document for each subsystem WP2, WP3, WP4, WP5 UB 01/10/2014 WP3 SRS
 
MS7 Public version of GENIUS portal WP6, WP7 CESCA 01/10/2014 Public version of GENIUS portal
MS8 Mid-term review WP1, WP2, WP3, WP4, WP5, WP6, WP7 UB 01/06/2015  
MS9 User prototype archive review WP2, WP3 UEDIN 01/10/2015  
Line: 20 to 20
 
MS15 Completion meeting & final external review WP1 UB 01/03/2017  
MS16 GENIUS products availability WP1, WP2, WP3, WP4, WP5, WP6, WP7 UB 01/04/2017 GENIUS products availability
MS17 Handover of GENIUS portal to Gaia community WP7 CESCA 01/04/2017 Handover of GENIUS portal to Gaia community
Added:
>
>

META FILEATTACHMENT attachment="GAIA-C9-SP-IFA-NCH-031.pdf" attr="h" comment="WP3 System Requirements Specification" date="1415703196" name="GAIA-C9-SP-IFA-NCH-031.pdf" path="GAIA-C9-SP-IFA-NCH-031.pdf" size="161635" user="NigelHambly" version="1"

Revision 42014-09-17 - NigelHambly

Line: 1 to 1
 
META TOPICPARENT name="WebLeftBar"

GENIUS Milestones

Line: 8 to 8
 
MS3 Hiring of main developers WP1, WP2, WP3, WP4, WP5, WP6, WP7 UB 01/02/2014  
MS4 GENIUS portal available at CESCA for internal use WP6, WP7 CESCA 01/04/2014 Two GENIUS portal developed at CESCA: one dedicated to the project and one for more general dissemination.
MS5 Archive user requirements document WP2 UL 01/10/2014  
Changed:
<
<
MS6 Requirements document for each subsystem WP2, WP3, WP4, WP5 UB 01/10/2014  
>
>
MS6 Requirements document for each subsystem WP2, WP3, WP4, WP5 UB 01/10/2014 WP3 SRS
 
MS7 Public version of GENIUS portal WP6, WP7 CESCA 01/10/2014 Public version of GENIUS portal
MS8 Mid-term review WP1, WP2, WP3, WP4, WP5, WP6, WP7 UB 01/06/2015  
MS9 User prototype archive review WP2, WP3 UEDIN 01/10/2015  

Revision 32014-04-30 - LolaBalaguer

Line: 1 to 1
 
META TOPICPARENT name="WebLeftBar"

GENIUS Milestones

Line: 6 to 6
 
MS1 Kick-off meeting (plenary) WP1 UB 01/11/2013 Meeting took place 4-5 Dec 2013
MS2 Agreed testbed environment with ESAC-SAT & CU9 WP3 UEDIN 01/02/2014 The testbed for Archive development has been agreed with SAT. And is based on the Gaia Archive Core System (GACS) described at the CU9 SDP..
MS3 Hiring of main developers WP1, WP2, WP3, WP4, WP5, WP6, WP7 UB 01/02/2014  
Changed:
<
<
MS4 GENIUS portal available at CESCA for internal use WP6, WP7 CESCA 01/04/2014 GENIUS portal available at CESCA for internal use
>
>
MS4 GENIUS portal available at CESCA for internal use WP6, WP7 CESCA 01/04/2014 Two GENIUS portal developed at CESCA: one dedicated to the project and one for more general dissemination.
 
MS5 Archive user requirements document WP2 UL 01/10/2014  
MS6 Requirements document for each subsystem WP2, WP3, WP4, WP5 UB 01/10/2014  
MS7 Public version of GENIUS portal WP6, WP7 CESCA 01/10/2014 Public version of GENIUS portal

Revision 22014-04-29 - LolaBalaguer

Line: 1 to 1
 
META TOPICPARENT name="WebLeftBar"

GENIUS Milestones

Milestone N. Milestone name WP Lead beneficiary Delivery date Comments
MS1 Kick-off meeting (plenary) WP1 UB 01/11/2013 Meeting took place 4-5 Dec 2013
Changed:
<
<
MS2 Agreed testbed environment with ESAC-SAT & CU9 WP3 UEDIN 01/02/2014 The Gaia CU9 SDP has been adopted as the document to follow.
>
>
MS2 Agreed testbed environment with ESAC-SAT & CU9 WP3 UEDIN 01/02/2014 The testbed for Archive development has been agreed with SAT. And is based on the Gaia Archive Core System (GACS) described at the CU9 SDP..
 
MS3 Hiring of main developers WP1, WP2, WP3, WP4, WP5, WP6, WP7 UB 01/02/2014  
MS4 GENIUS portal available at CESCA for internal use WP6, WP7 CESCA 01/04/2014 GENIUS portal available at CESCA for internal use
MS5 Archive user requirements document WP2 UL 01/10/2014  

Revision 12014-04-29 - LolaBalaguer

Line: 1 to 1
Added:
>
>
META TOPICPARENT name="WebLeftBar"

GENIUS Milestones

Milestone N. Milestone name WP Lead beneficiary Delivery date Comments
MS1 Kick-off meeting (plenary) WP1 UB 01/11/2013 Meeting took place 4-5 Dec 2013
MS2 Agreed testbed environment with ESAC-SAT & CU9 WP3 UEDIN 01/02/2014 The Gaia CU9 SDP has been adopted as the document to follow.
MS3 Hiring of main developers WP1, WP2, WP3, WP4, WP5, WP6, WP7 UB 01/02/2014  
MS4 GENIUS portal available at CESCA for internal use WP6, WP7 CESCA 01/04/2014 GENIUS portal available at CESCA for internal use
MS5 Archive user requirements document WP2 UL 01/10/2014  
MS6 Requirements document for each subsystem WP2, WP3, WP4, WP5 UB 01/10/2014  
MS7 Public version of GENIUS portal WP6, WP7 CESCA 01/10/2014 Public version of GENIUS portal
MS8 Mid-term review WP1, WP2, WP3, WP4, WP5, WP6, WP7 UB 01/06/2015  
MS9 User prototype archive review WP2, WP3 UEDIN 01/10/2015  
MS10 Exploitation tools review WP2, WP4 UB 01/10/2015  
MS11 Validation tools review WP2, WP5 CNRS 01/10/2015 Validation tools review
MS12 Prototype archive tools open to community WP1, WP2, WP3, WP4, WP5, WP6, WP7 UB 01/10/2015 User testing will allow to give the necessary feedback on the archive tools which have been developed. Most Gaia data will not be available at the date of the milestone, but the testing will nevertheless be possible by providing access to simulated data. In order to get a feedback as large as possible on the archive tools, the access will be given to a large panel of users within and outside the Gaia community. They will e.g. be selected among the users having made requirements proposals (cf. GAIA-C9-TN-LEI-AB-026-1).
MS13 Stress test WP3 UEDIN 01/09/2016  
MS14 Load of actual Gaia data WP3, WP5 CNRS 01/01/2017 Load of actual Gaia data
MS15 Completion meeting & final external review WP1 UB 01/03/2017  
MS16 GENIUS products availability WP1, WP2, WP3, WP4, WP5, WP6, WP7 UB 01/04/2017 GENIUS products availability
MS17 Handover of GENIUS portal to Gaia community WP7 CESCA 01/04/2017 Handover of GENIUS portal to Gaia community
 